How To Update Production Version in SAP PP Module

This transaction is a process to display and change an existing production version.
How to access production version using menu:
Logistics -> Production Process -> Master Date -> Production Version
How access production version using TCODE:
C223
The entry process to see “Production Version Per Plant”.
Select the plant where you want to see the production version and press enter.

ppp25-1
To see production version per material, just add the material parameter and press enter.
ppp26-2
Scroll to the bottom of the page and click on the “Create Production Version” button to create a new one.
ppp26-3
Now fill the required data in your new production version:
ppp26-4
1. Plant: The plant where the material is located.
2. Material: The material number that you want to create the production version.
3. Production Version: This is the production version sequence.
4. Description: The production version description.
5. From Lot Size: Minimum lot size.
6. To Lot Size: Maximum lot size.
7. Task list type: Type of task list.
8. Group: Recipe Group.
9. Group counter: Group counter from master recipe.
10. Bom usage: The bom location.
11. Issue Stor. Location: The location of the product.
12. Receiv Location: the location where to receive the item from production.
Press enter to save the production version.